{"id":4531,"date":"2021-06-03T03:00:12","date_gmt":"2021-06-03T03:00:12","guid":{"rendered":"http:\/\/timeline-kreuznach.de\/schutz-vor-groesseren-regenmengen-neues-regenrueckhaltebecken-im-gewerbegebiet-p-7-1-eingeweiht"},"modified":"2021-06-03T03:00:12","modified_gmt":"2021-06-03T03:00:12","slug":"schutz-vor-groesseren-regenmengen-neues-regenrueckhaltebecken-im-gewerbegebiet-p-7-1-eingeweiht","status":"publish","type":"post","link":"https:\/\/timeline-kreuznach.de\/en\/schutz-vor-groesseren-regenmengen-neues-regenrueckhaltebecken-im-gewerbegebiet-p-7-1-eingeweiht","title":{"rendered":"New rainwater retention basin in the P.7.1 industrial estate inaugurated"},"content":{"rendered":"<div>The new commercial area P.7.1 east of the B 428 between the city center, Planig and Bosenheim has been under development since the end of 2012. Initially, the approximately 23-hectare commercial area, 80 percent of which may be paved according to the development plan, lacked an appropriate drainage system. Since September 2019, a new rainwater retention basin has therefore been built on behalf of the Bad Kreuznach wastewater disposal facility - in the bend of Karl-F\u00f6rster-Stra\u00dfe between Am Grenzgraben and Seeber Flur. The underground basin made of reinforced concrete has now been completed and is in operation.<\/div>\n<p class=\"wpematico_credit\"><small>Powered by <a href=\"http:\/\/www.wpematico.com\" target=\"_blank\" rel=\"noopener noreferrer\">WPeMatico<\/a><\/small><\/p>","protected":false},"excerpt":{"rendered":"<p>Seit Ende 2012 wird das neue Gewerbegebiet P.7.1 \u00f6stlich der B 428 zwischen Kernstadt, Planig und Bosenheim erschlossen. Zun\u00e4chst fehlte der rund 23 Hektar gro\u00dfen Gewerbefl\u00e4che, die nach dem Bebauungsplan zu 80 Prozent befestigt werden darf, eine entsprechende Entw\u00e4sserung. Seit September 2019 wurde daher im Auftrag der Abwasserbeseitigungseinrichtung der Stadt Bad Kreuznach ein neues Regenr\u00fcckhaltebecken [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[6],"class_list":["post-4531","post","type-post","status-publish","format-standard","hentry","category-stadtkreuznach","tag-stadtnews"],"_links":{"self":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/posts\/4531","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/comments?post=4531"}],"version-history":[{"count":0,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/posts\/4531\/revisions"}],"wp:attachment":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/media?parent=4531"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/categories?post=4531"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/tags?post=4531"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}