{"id":3980,"date":"2021-03-16T03:01:17","date_gmt":"2021-03-16T03:01:17","guid":{"rendered":"http:\/\/timeline-kreuznach.de\/neubau-der-hermannsbruecke-ueber-den-graefenbach-startet"},"modified":"2021-03-16T03:01:17","modified_gmt":"2021-03-16T03:01:17","slug":"neubau-der-hermannsbruecke-ueber-den-graefenbach-startet","status":"publish","type":"post","link":"https:\/\/timeline-kreuznach.de\/en\/neubau-der-hermannsbruecke-ueber-den-graefenbach-startet","title":{"rendered":"New construction of the Hermannsbr\u00fccke bridge over the Gr\u00e4fenbach starts"},"content":{"rendered":"<div>The Hermannsbr\u00fccke bridge over the Gr\u00e4fenbach at the \"Lohrer M\u00fchle\" is an important connection for cyclists and pedestrians to and from the city. However, it is in a very poor structural condition. In the inspection of the city's bridges between 2017 and 2019, it scored 3.8 - an unsatisfactory structural condition that made immediate replacement necessary. The Hermannsbr\u00fccke will therefore be replaced by a new bridge this spring as planned. At the ground-breaking ceremony on Monday, Lord Mayor Dr. Heike Kaster-Meurer and Philipp Geib, Head of the Civil Engineering and Green Spaces Department of the City Planning Office, presented the upcoming work.<\/div>\n<p class=\"wpematico_credit\"><small>Powered by <a href=\"http:\/\/www.wpematico.com\" target=\"_blank\" rel=\"noopener noreferrer\">WPeMatico<\/a><\/small><\/p>","protected":false},"excerpt":{"rendered":"<p>Die Hermannsbr\u00fccke \u00fcber den Gr\u00e4fenbach an der \u201eLohrer M\u00fchle\u201c ist eine wichtige Verbindung f\u00fcr Radfahrer und Fu\u00dfg\u00e4nger von und in die Stadt. Baulich ist sie jedoch in einem sehr schlechten Zustand. Bei der Pr\u00fcfung der st\u00e4dtischen Br\u00fccken zwischen 2017 und 2019 schnitt sie mit der Note 3,8 ab \u2013 ein ungen\u00fcgender Bauwerkszustand, der eine umgehende [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[6],"class_list":["post-3980","post","type-post","status-publish","format-standard","hentry","category-stadtkreuznach","tag-stadtnews"],"_links":{"self":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/posts\/3980","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/comments?post=3980"}],"version-history":[{"count":0,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/posts\/3980\/revisions"}],"wp:attachment":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/media?parent=3980"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/categories?post=3980"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/tags?post=3980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}