{"id":3930,"date":"2021-03-04T03:01:46","date_gmt":"2021-03-04T03:01:46","guid":{"rendered":"http:\/\/timeline-kreuznach.de\/salinental-wird-fuer-saisonbeginn-fit-gemacht-unterhaltungsarbeiten-als-daueraufgabe"},"modified":"2021-03-04T03:01:46","modified_gmt":"2021-03-04T03:01:46","slug":"salinental-wird-fuer-saisonbeginn-fit-gemacht-unterhaltungsarbeiten-als-daueraufgabe","status":"publish","type":"post","link":"https:\/\/timeline-kreuznach.de\/en\/salinental-wird-fuer-saisonbeginn-fit-gemacht-unterhaltungsarbeiten-als-daueraufgabe","title":{"rendered":"Graduation towers are made fit for the start of the season - maintenance work as an ongoing task"},"content":{"rendered":"<div>Work is currently underway in many parts of the salt works in Bad Kreuznach and Bad M\u00fcnster am Stein-Ebernburg in preparation for the start of the season until Easter. A major construction site is the graduation house at the Salinenbr\u00fccke bridge, where a total of 120 meters of thorn wall with covering are being renewed. 26,000 bundles of blackthorn will be installed. The supporting structure will also be renewed. Once this work has been completed, this graduation house will be renovated for the next 15 to 20 years. The entire project will cost around 240,000 euros.<\/div>\n<p class=\"wpematico_credit\"><small>Powered by <a href=\"http:\/\/www.wpematico.com\" target=\"_blank\" rel=\"noopener noreferrer\">WPeMatico<\/a><\/small><\/p>","protected":false},"excerpt":{"rendered":"<p>Derzeit wird an vielen Stellen der Salinen in Bad Kreuznach und Bad M\u00fcnster am Stein-Ebernburg Hand angelegt, um den Saisonbeginn bis Ostern vorzubereiten. Gro\u00dfbaustelle ist das Gradierwerk an der Salinenbr\u00fccke, hier werden insgesamt 120 Meter Dornwand mit Belattung erneuert. 26.000 B\u00fcndel Schwarzdorn werden eingebaut. Daf\u00fcr wird die Tragkonstruktion erneuert. Wenn diese Arbeiten abgeschlossen sind, ist [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[6],"class_list":["post-3930","post","type-post","status-publish","format-standard","hentry","category-stadtkreuznach","tag-stadtnews"],"_links":{"self":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/posts\/3930","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/comments?post=3930"}],"version-history":[{"count":0,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/posts\/3930\/revisions"}],"wp:attachment":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/media?parent=3930"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/categories?post=3930"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/tags?post=3930"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}