{"id":3911,"date":"2021-02-16T03:02:44","date_gmt":"2021-02-16T03:02:44","guid":{"rendered":"http:\/\/timeline-kreuznach.de\/nach-brand-in-neustadt-sicherungsarbeiten-durch-thw-und-bauaufsicht-abgeschlossen"},"modified":"2021-02-16T03:02:44","modified_gmt":"2021-02-16T03:02:44","slug":"nach-brand-in-neustadt-sicherungsarbeiten-durch-thw-und-bauaufsicht-abgeschlossen","status":"publish","type":"post","link":"https:\/\/timeline-kreuznach.de\/en\/nach-brand-in-neustadt-sicherungsarbeiten-durch-thw-und-bauaufsicht-abgeschlossen","title":{"rendered":"After fire in Neustadt: safety work completed by THW and building inspectorate"},"content":{"rendered":"<div>After the building fire at Kleine Kannengasse 8 and 10 in Bad Kreuznach's Neustadt district late on Saturday evening, the safety work has been completed. The Technical Relief Organization (THW), commissioned by the municipal building inspectorate, ended the operation at around 3 a.m. on Monday night. The closure of Hochstra\u00dfe has now been lifted, but Kleine Kannengasse will remain closed until further notice.<\/div>\n<p class=\"wpematico_credit\"><small>Powered by <a href=\"http:\/\/www.wpematico.com\" target=\"_blank\" rel=\"noopener noreferrer\">WPeMatico<\/a><\/small><\/p>","protected":false},"excerpt":{"rendered":"<p>Nach dem Geb\u00e4udebrand in der Kleinen Kannengasse 8 und 10 in der Bad Kreuznacher Neustadt am sp\u00e4ten Samstagabend sind die Sicherungsarbeiten abgeschlossen. Das von der st\u00e4dtischen Bauaufsicht beauftragte Technische Hilfswerk (THW) hat den Einsatz Montagnacht gegen 3 Uhr beendet. Die Sperrung der Hochstra\u00dfe ist inzwischen aufgehoben, die Kleine Kannengasse bleibt bis auf Weiteres gesperrt. Powered [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[6],"class_list":["post-3911","post","type-post","status-publish","format-standard","hentry","category-stadtkreuznach","tag-stadtnews"],"_links":{"self":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/posts\/3911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/comments?post=3911"}],"version-history":[{"count":0,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/posts\/3911\/revisions"}],"wp:attachment":[{"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/media?parent=3911"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/categories?post=3911"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/timeline-kreuznach.de\/en\/wp-json\/wp\/v2\/tags?post=3911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}